Managed to find the two metal bungs to go into the gearbox, so fitted them and attached the gearbox to the engine too.
Used up most of the empty Caterham cardboard boxes to protect the inside of the engine bay, prior to swinging the engine and box in with the engine crane.
A Blog created by Nigel Pugh to document the background and build of his new Caterham Superlight Twenty car as a complete CKD ( Complete Knock Down) Kit Build.
Monday, 7 March 2016
Sunday, 6 March 2016
A small amount of progress today.
So I had hoped to get the engine and gearbox into the car this weekend, sadly family commitments worked against us!
However managed to get all the engine prep done, so bell housing to gearbox mounted together, then gearbox and bellhousing mounted to the engine.
I also made sure all the prep was done for the engine, prior to installation in the engine bay, so mounts in position, and washer bottle, and piping run in the tunnel.
However managed to get all the engine prep done, so bell housing to gearbox mounted together, then gearbox and bellhousing mounted to the engine.
I also made sure all the prep was done for the engine, prior to installation in the engine bay, so mounts in position, and washer bottle, and piping run in the tunnel.
Thursday, 3 March 2016
Some build progress photos.
Hi everyone, sorry there has not been much in the way of updates. Truth be told life and other comitments means not much has been done this week.
But here's some photos of the small amount of work I have completed so far.
Subscribe to:
Posts (Atom)

















































